To give you a general idea of what you need for the installation of a new swimming pool in France, we’ve made a bit of a list of all the main necessities and accessories you’ll need or want to order. It’s quite an undertaking, but of course you can rely on our very professional pool builders if you want to get serious about having a pool built, at least in Southern Burgundy.
GROUND WORK
Excavation of the pool area including stripping of topsoil, digging the pool and placing the removed soil in a pile for reuse or on a truck for disposal. The excavation is intended for loose, rock-free soil. Any additional rock breaking and evacuation is subject to a supplement.
LANDSCAPING
Levelling of land extracted from the pool excavation on the ground, either to backfill the water hole or on another part of your property.
BACKFILLING
Construction of a drainage and decompression well. Backfilling around the basin with incompressible draining materials.
SWIMMING POOL KIT
Pool kit with the desired dimensions. For instance 10,00 x 4,00m with a flat bottom, depth 1,45m, with a staircase of 4 straight steps over the full width. Water volume approx. 55 m3
FILTRATION
Filtering unit and parts to be sealed: bottom drain, outlets, skimmers, brush socket and LED projectors. High Efficiency Glass Media filter equipped with a manual valve 16m3/h, filtration fineness approaching 5 microns. Electrical box with differential circuit breaker, clock, temperature sensor, transformer and remote control for projectors and socket.
INSTALLATION
Installation of the swimming pool: – Installation. Supply of concrete and reinforcement. Assembly of the structure on a clean base: assembly of the various modules, adjustment of the whole, installation of the reinforcement, assembly of the stairs, pouring of the walls and the bottom – installation of the filtration system. Supply and installation of the power supply from the house panel. Site cleaning
PVC steps
Plain and non-slip reinforced PVC on the steps. Colours to be defined. 10-year warranty. Filling the swimming pool with water.
POOL COVER – BAR COVER
Bar cover, compliant with NFP 90-308 standard.
SUBMERSIBLE DAMPER
Concrete partition wall to form the shutter box. Installation of a bottom drain and a discharge. Control with Smartphone.
POOL EQUIPMENT
SALT ELECTROLYZER
PH REGULATOR
Salt electrolyser with pH regulator.
HEAT PUMP 11.7 Kw MONO
PAVING THE HEAT PUMP 1
Creating a concrete base. Installation and connection of the heat pump.
ACCESSORIES KIT
Accessories Kit with telescopic handle, a broom head, floating hose, stainless steel brush, bottom andsurface landing net, floating thermometer, a Net Skim box and a chlorine, pH and TAC tester.
ROBOT SOLAR SHOWER
Solar shower 30 litres, connection included.
BEACH SLAB IN REINFORCED CONCRETE
Support piles from the bottom of the earthwork. Thick reinforced concrete slab.
SLAB BEACH
Megasmooth slabs on a gravel bed, not joined for easy drainage.
STAIRCASE
Staircase with 4 steps in Megasmooth Grey Velvet step blocks, placed on a concrete bed.
SLOPE PLANTING Green or brown above-ground canvas on the slopes on each side of the staircase created.Various shrubs. including: transport, pruning, placement with soil and fertilizer, and the guarantee of reforestation.